Existing System’s Major Issues

Insulation:

FIGURE 1 – Failed Piping Insulation

FIGURE 2 – Additional Failed Piping Insulation Due to Compromised Vapor Barrier

FIGURE 3 – AHU Door Not Sealed Properly at Cooling Coil Entrance Access Door

Condensation & Moisture Control:

FIGURE 4 – Moisture Damage on Ceiling and HVAC Access Panel

FIGURE 5 – Lens Cavity at Building Perimeter Shows Leak Damage Due to Moisture Formation

FIGURE 6 – Compromised Vapor Barrier

Component Failure and Upgrades

FIGURE 7 – Louver Intakes Found to be Damaged, Broken, and Dirty

FIGURE 8 – Hardware at End of Life

FIGURE 9 – Equipment at End of Life

FIGURE 10 – Failed Valves Due to Corrosion

Updated Controls:

FIGURE 11 – VFDs Only on Certain Equipment

Water Use – Indoor and Outdoor

FIGURE 12 – Lack of Insulation at Domestic Water Lines